SolarEdge Power Management package <100A grid supply UK delivery cost – £11 Global delivery cost – calculated at checkoutUK....
SolarEdge Power Management package <100A grid supply
Global delivery cost – calculated at checkout
UK delivery time – next day, 13.30 cut off
Global delivery time – approximately 2-5 business days
Part No: SE-PM-WND-1PH-100A Power Management - Export Limitation 1ph
This part is made up of the following items:
1 x 1PH/3PH 230/400V SolarEdge Energy Meter K2 with Modbus Connection
1 x 100A Split-Core Current Transformer for SolarEdge Energy Meters with Modbus Connection
10 x Double pair genuine RS485 cable 1M - 4 cores
This kit is a full monitoring package for Solaredge domestic systems that allows full recording and display of energy generation and usage. Ensures that the complete system is performing at its maximum potential and enables optimisation of energy consumption.
Subject to the approval of your local DNO this package may be used to limit the power export of the system to a value agreed with the DNO. e.g. a 100kWp PV system with 85kW of inverters could be limited to 75kW of AC export power if that is required by the DNO. During periods of self consumption, e.g. Monday - Friday, sufficient power is likely to be used by the property and so no limitation is applied but during high generation and low self consumption periods the system will automatically trim the maximum export power to a DNO defined limit. With most commercial buidings this 'lost' energy will be a very small percentage of the total annual generation and the benefit of having additional generation capacity most of the time will far outweigh the lost generation during other times.
Note: This package includes an energy meter and 100A CT for a single inverter system. For a system with multiple inverters depending on inverter type, an additonal RS-485 expansion kit might be required. This allows multiple inverters to be connected in a communication bus and also to the energy meter.
A 10m length of RS-485 cable is included for connection between the inverter and energy meter, and for connecting the inverters in the bus. Please check if this quantity is sufficient.
Supplied with 1 X 100A current monitoring clamps suitable for installation on properties with up to 100A per phase power supply.
Current clamps should be sized according to incoming grid supply in the property, please check if these are sufficient before buying. Please note other CTs are available.
Shipping
Products are generally delivered on a next day delivery for orders received before 13.00. If we are not able to delivery next day we will inform you. It is important that there is somebody available between 9-5 on the day of delivery. If there isn't somebody available there is likely to be a re-delivery charge from the courier.
Our courier will deliver nationwide, however for pallet deliveries there may be extra delivery charges for remote locations.
For peace of mind, your item will be delivered fully insured and would be exchanged Free of Charge in any rare case of damage.
Goods can be returned within 14 days of purchase.
If you have changed your mind and want to return items, please contact us and we will advise you on the returns process.
In the unlikely event that you receive faulty or damaged goods, we will offer a replacement or a refund, if the items are returned to us within 30 days of receiving.